Services
Key Projects
Other Projects

Featured Project:

Section 7 Consultation and Wetlands Permitting for the Fontana Business Center

MBA has prepared a draft Biological Assessment (BA) and coordinated a Section 7 consultation for the US Army Corps of Engineers (USACE) that analyzed the biological effects of developing approximately 200-acre site in south Fontana. Proposed future development for the site includes industrial and business park uses, and a hotel on 4 acres on the northwest corner of the site. A 2002 Protocol Survey determined that DSF currently occupy a 1-acre portion of the site. The majority of the site no longer supports viable DSF habitat. A habitat assessment determined that only 40-acres provided low quality but suitable habitat. USACE took jurisdiction over the 40-acres of potential habitat that bordered a drainage channel with wetlands vegetation. MBA successfully negotiated acceptable conservation measures under the Section 7 Consultation that resulted in the issuance of a non-jeopardy Biological Opinion that will allow development of the entire 200-acre site. MBA also prepared and submitted an application for a 404 Wetlands Permit, a 401 Water Certification Permit, and a 1603 Streambed Alteration Permit. All three permits were successfully processed and received by the City of Fontana.

Other Natural Resources Projects:

  Services
 
  • Biological Assessments
  • Special Status
         Species Surveys
  • Habitat Characterizations,
         Mapping, and Impact
         Analyses
  • Mitigation Plans
         and Restoration
  • Construction Mitigation
  •